Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups

Silvio A. de Araujo, Marcos N. Arenales, Alistair R. Clark. Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups. J. Heuristics, 13(4):337-358, 2007. [doi]

Abstract

Abstract is missing.