Bridging the gap between self schedules and feasible schedules in staff scheduling

Eyjólfur Ingi Ásgeirsson. Bridging the gap between self schedules and feasible schedules in staff scheduling. Annals OR, 218(1):51-69, 2014. [doi]

Abstract

Abstract is missing.