A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines

Maliheh Aramon Bajestani, J. Christopher Beck. A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines. J. Scheduling, 18(5):471-486, 2015. [doi]

Abstract

Abstract is missing.