Short-term production scheduling with non-triangular sequence-dependent setup times and shifting production bottlenecks

Joost Berkhout, Eric J. Pauwels, Rob van der Mei, Jan Stolze, Siem Broersen. Short-term production scheduling with non-triangular sequence-dependent setup times and shifting production bottlenecks. Int. J. Prod. Res., 59(3):727-751, 2021. [doi]

Authors

Joost Berkhout

This author has not been identified. Look up 'Joost Berkhout' in Google

Eric J. Pauwels

This author has not been identified. Look up 'Eric J. Pauwels' in Google

Rob van der Mei

This author has not been identified. Look up 'Rob van der Mei' in Google

Jan Stolze

This author has not been identified. Look up 'Jan Stolze' in Google

Siem Broersen

This author has not been identified. Look up 'Siem Broersen' in Google