Short-term production scheduling with non-triangular sequence-dependent setup times and shifting production bottlenecks

Joost Berkhout, Eric J. Pauwels, Rob van der Mei, Jan Stolze, Siem Broersen. Short-term production scheduling with non-triangular sequence-dependent setup times and shifting production bottlenecks. Int. J. Prod. Res., 59(3):727-751, 2021. [doi]

Abstract

Abstract is missing.