The following publications are possibly variants of this publication:
- A note on the two machine job shop with the weighted late work criterionJacek Blazewicz, Erwin Pesch, Malgorzata Sterna, Frank Werner. scheduling, 10(2):87-95, 2007. [doi]
- Flow Shop Scheduling with Late Work Criterion - Choosing the Best Solution StrategyJacek Blazewicz, Erwin Pesch, Malgorzata Sterna, Frank Werner. AACC 2004: 68-75 [doi]
- Scheduling on parallel identical machines with late work criterion: Offline and online casesXin Chen, Malgorzata Sterna, Xin Han, Jacek Blazewicz. scheduling, 19(6):729-736, 2016. [doi]
- The two-machine flow-shop problem with weighted late work criterion and common due dateJacek Blazewicz, Erwin Pesch, Malgorzata Sterna, Frank Werner. eor, 165(2):408-415, 2005. [doi]