A note on the two machine job shop with the weighted late work criterion

Jacek Blazewicz, Erwin Pesch, Malgorzata Sterna, Frank Werner. A note on the two machine job shop with the weighted late work criterion. J. Scheduling, 10(2):87-95, 2007. [doi]

Abstract

Abstract is missing.