A drum-buffer-rope based scheduling method for semiconductor manufacturing system

Zhengcai Cao, Yazhen Peng, Yongji Wang. A drum-buffer-rope based scheduling method for semiconductor manufacturing system. In IEEE Conference on Automation Science and Engineering, CASE 2011, Trieste, Italy, Aug. 24-27, 2011. pages 120-125, IEEE, 2011. [doi]

Authors

Zhengcai Cao

This author has not been identified. Look up 'Zhengcai Cao' in Google

Yazhen Peng

This author has not been identified. Look up 'Yazhen Peng' in Google

Yongji Wang

This author has not been identified. Look up 'Yongji Wang' in Google