A drum-buffer-rope based scheduling method for semiconductor manufacturing system

Zhengcai Cao, Yazhen Peng, Yongji Wang. A drum-buffer-rope based scheduling method for semiconductor manufacturing system. In IEEE Conference on Automation Science and Engineering, CASE 2011, Trieste, Italy, Aug. 24-27, 2011. pages 120-125, IEEE, 2011. [doi]

Abstract

Abstract is missing.