Bi-level multi-agent collaborative dynamic scheduling for flexible flow shops with tight temporal and limited buffer constraints

Daliang Chang, Fengchuan Xie, Fucheng Pan, Shi Jin. Bi-level multi-agent collaborative dynamic scheduling for flexible flow shops with tight temporal and limited buffer constraints. J. Ind. Inf. Integr., 53:101181, 2026. [doi]

Abstract

Abstract is missing.