Scheduling a two-stage no-wait hybrid flowshop with separated setup and removal times

JunLin Chang, Weiwu Yan, Huihe Shao. Scheduling a two-stage no-wait hybrid flowshop with separated setup and removal times. In Proceedings of the 2004 American Control Conference, ACC 2004, Boston, MA, USA, June 30 - July 2, 2004. pages 1412-1416, IEEE, 2004. [doi]

Abstract

Abstract is missing.