An improved heuristic for two-machine flowshop scheduling with an availability constraint

T. C. Edwin Cheng, Guoqing Wang. An improved heuristic for two-machine flowshop scheduling with an availability constraint. Oper. Res. Lett., 26(5):223-229, 2000. [doi]

Abstract

Abstract is missing.