Minimizing makespan in a flow-line manufacturing cell with sequence dependent family setup times

Hui-Miao Cheng, Kuo-Ching Ying. Minimizing makespan in a flow-line manufacturing cell with sequence dependent family setup times. Expert Syst. Appl., 38(12):15517-15522, 2011. [doi]

Abstract

Abstract is missing.