Solving the hybrid flow shop scheduling problem with limited human resource constraint

Antonio Costa 0001, Victor Fernandez-Viagas, Jose M. FramiƱan. Solving the hybrid flow shop scheduling problem with limited human resource constraint. Computers & Industrial Engineering, 146:106545, 2020. [doi]

Abstract

Abstract is missing.