Scheduling the lot-streaming flow shop problem using a shuffled frog-leaping algorithm

Jun-Hua Duan, Quan-ke Pan, KaiZhuo Gao, Junqing Li, Zhenqiang Bao. Scheduling the lot-streaming flow shop problem using a shuffled frog-leaping algorithm. In Sixth International Conference on Natural Computation, ICNC 2010, Yantai, Shandong, China, 10-12 August 2010. pages 4263-4266, IEEE, 2010. [doi]

Abstract

Abstract is missing.