The Common Cycle Economic Lot Scheduling Problem with Backorders: Benefits of Controllable Production Rates

Mohsen Elhafsi, Sherman X. Bai. The Common Cycle Economic Lot Scheduling Problem with Backorders: Benefits of Controllable Production Rates. J. Global Optimization, 10(3):283-303, 1997. [doi]

Abstract

Abstract is missing.