A Phased Scheduling Method with an Improved GA for Material Delivery Problem of Aircraft Pulsating Assembly Line

Yiwen Fang, Fei Qiao, Juan Liu 0011. A Phased Scheduling Method with an Improved GA for Material Delivery Problem of Aircraft Pulsating Assembly Line. In IEEE International Conference on Systems, Man, and Cybernetics, SMC 2023, Honolulu, Oahu, HI, USA, October 1-4, 2023. pages 2701-2706, IEEE, 2023. [doi]

Abstract

Abstract is missing.