Solution approaches for the soft drink integrated production lot sizing and scheduling problem

Deisemara Ferreira, Reinaldo Morabito, Socorro Rangel. Solution approaches for the soft drink integrated production lot sizing and scheduling problem. European Journal of Operational Research, 196(2):697-706, 2009. [doi]

Abstract

Abstract is missing.