A heuristic for scheduling in a two-stage hybrid flowshop with renewable resources shared among the stages

Ewa Figielska. A heuristic for scheduling in a two-stage hybrid flowshop with renewable resources shared among the stages. European Journal of Operational Research, 236(2):433-444, 2014. [doi]

Abstract

Abstract is missing.