Integration of LiDAR scan-to-IFC and UWB real-time positioning for automated construction monitoring: a precast module case study

Maggie Y. Gao, Chengjia Han, Zhen Peng, Yiqing Dong, Robert L. K. Tiong, Yaowen Yang. Integration of LiDAR scan-to-IFC and UWB real-time positioning for automated construction monitoring: a precast module case study. AI in Engineering, 71:104247, 2026. [doi]

Abstract

Abstract is missing.