Yuan Gao, Jinjiang Yuan, Chi To Ng, T. C. E. Cheng. A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan. European Journal of Operational Research, 273(1):74-81, 2019. [doi]
Abstract is missing.