Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost

Yuan Gao, Jinjiang Yuan, C. T. Ng 0001, T. C. E. Cheng. Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost. 4OR, 20(2):273-287, 2022. [doi]

Abstract

Abstract is missing.