A Control Scheme for Automatic Level Crossings Under the ERTMS/ETCS Level 2/3 Operation

Mohamed Ghazel. A Control Scheme for Automatic Level Crossings Under the ERTMS/ETCS Level 2/3 Operation. IEEE Transactions on Intelligent Transportation Systems, 18(10):2667-2680, 2017. [doi]

Abstract

Abstract is missing.