Bounds on M/G/k Scheduling Under Moderate Load Improving on SRPT-k and Tightening Lower Bounds

Isaac Grosof, Ziyuan Wang. Bounds on M/G/k Scheduling Under Moderate Load Improving on SRPT-k and Tightening Lower Bounds. SIGMETRICS Performance Evaluation Review, 52(2):24-26, 2024. [doi]

Authors

Isaac Grosof

This author has not been identified. Look up 'Isaac Grosof' in Google

Ziyuan Wang

This author has not been identified. Look up 'Ziyuan Wang' in Google