Bounds on M/G/k Scheduling Under Moderate Load Improving on SRPT-k and Tightening Lower Bounds

Isaac Grosof, Ziyuan Wang. Bounds on M/G/k Scheduling Under Moderate Load Improving on SRPT-k and Tightening Lower Bounds. SIGMETRICS Performance Evaluation Review, 52(2):24-26, 2024. [doi]

@article{GrosofW24,
  title = {Bounds on M/G/k Scheduling Under Moderate Load Improving on SRPT-k and Tightening Lower Bounds},
  author = {Isaac Grosof and Ziyuan Wang},
  year = {2024},
  doi = {10.1145/3695411.3695421},
  url = {https://doi.org/10.1145/3695411.3695421},
  researchr = {https://researchr.org/publication/GrosofW24},
  cites = {0},
  citedby = {0},
  journal = {SIGMETRICS Performance Evaluation Review},
  volume = {52},
  number = {2},
  pages = {24-26},
}