Hengwei Guo, Hongyan Sang, Xujin Zhang, Peng Duan, Junqing Li, Yuyan Han. An effective fruit fly optimization algorithm for the distributed permutation flowshop scheduling problem with total flowtime. Eng. Appl. of AI, 123(Part B):106347, 2023. [doi]
Abstract is missing.