Predicting the effect of process time variability on annual production in a cell culture manufacturing facility

Stephen Hall. Predicting the effect of process time variability on annual production in a cell culture manufacturing facility. In Proceedings of the 37th Winter Simulation Conference, Orlando, FL, USA, December 4-7, 2005. pages 34, ACM, 2005. [doi]

@inproceedings{Hall05:6,
  title = {Predicting the effect of process time variability on annual production in a cell culture manufacturing facility},
  author = {Stephen Hall},
  year = {2005},
  doi = {10.1145/1162708.1163209},
  url = {http://doi.acm.org/10.1145/1162708.1163209},
  researchr = {https://researchr.org/publication/Hall05%3A6},
  cites = {0},
  citedby = {0},
  pages = {34},
  booktitle = {Proceedings of the 37th Winter Simulation Conference, Orlando, FL, USA, December 4-7, 2005},
  publisher = {ACM},
  isbn = {0-7803-9519-0},
}