Predicting the effect of process time variability on annual production in a cell culture manufacturing facility

Stephen Hall. Predicting the effect of process time variability on annual production in a cell culture manufacturing facility. In Proceedings of the 37th Winter Simulation Conference, Orlando, FL, USA, December 4-7, 2005. pages 34, ACM, 2005. [doi]

Abstract

Abstract is missing.