Dynamic priority rule-based forward-backward heuristic algorithm for resource levelling problem in construction project

Lihua He, Lianying Zhang. Dynamic priority rule-based forward-backward heuristic algorithm for resource levelling problem in construction project. JORS, 64(8):1106-1117, 2013. [doi]

Abstract

Abstract is missing.