Two parallel-machine scheduling with maximum waiting time for an emergency job

Yiwei Jiang, Haodong Yuan, Ping Zhou, T. C. E. Cheng, Min Ji 0001. Two parallel-machine scheduling with maximum waiting time for an emergency job. Int. J. Prod. Res., 62(16):6016-6027, 2024. [doi]

Abstract

Abstract is missing.