Scheduling jobs with time constraints between consecutive process steps in semiconductor manufacturing

Andreas Klemmt, Lars Mönch. Scheduling jobs with time constraints between consecutive process steps in semiconductor manufacturing. In Oliver Rose, Adelinde M. Uhrmacher, editors, Winter Simulation Conference, WSC '12, Berlin, Germany, December 9-12, 2012. pages 194, WSC, 2012. [doi]

Abstract

Abstract is missing.