Simulation-based optimisation of inspection stations allocation in multi-product manufacturing systems

Przemyslaw Korytkowski, Tomasz Wisniewski. Simulation-based optimisation of inspection stations allocation in multi-product manufacturing systems. IJAOM, 4(1/2):105-123, 2012. [doi]

Abstract

Abstract is missing.