Optimal Inspection Policy for a Three-Stage System Considering the Production Wait Time

Gang Kou, Yaying Liu, Hui Xiao, Rui Peng 0001. Optimal Inspection Policy for a Three-Stage System Considering the Production Wait Time. IEEE Transactions on Reliability, 72(3):934-949, September 2023. [doi]

Abstract

Abstract is missing.