An improved heuristic to minimize total flow time for scheduling in the m-machine no-wait flow shop

Dipak Laha, Sagar U. Sapkal. An improved heuristic to minimize total flow time for scheduling in the m-machine no-wait flow shop. Computers & Industrial Engineering, 67:36-43, 2014. [doi]

Abstract

Abstract is missing.