Scheduling of imperfect inspections for reliability critical systems with shock-driven defects and delayed failures

Gregory Levitin, Maxim Finkelstein, Hong-Zhong Huang. Scheduling of imperfect inspections for reliability critical systems with shock-driven defects and delayed failures. Rel. Eng. & Sys. Safety, 189:89-98, 2019. [doi]

Authors

Gregory Levitin

This author has not been identified. Look up 'Gregory Levitin' in Google

Maxim Finkelstein

This author has not been identified. Look up 'Maxim Finkelstein' in Google

Hong-Zhong Huang

This author has not been identified. Look up 'Hong-Zhong Huang' in Google