Scheduling of imperfect inspections for reliability critical systems with shock-driven defects and delayed failures

Gregory Levitin, Maxim Finkelstein, Hong-Zhong Huang. Scheduling of imperfect inspections for reliability critical systems with shock-driven defects and delayed failures. Rel. Eng. & Sys. Safety, 189:89-98, 2019. [doi]

Abstract

Abstract is missing.