Analysis of the Transmission of Project Duration and Cost Impacts Based on the GERT Network Technique

Zhiyong Li, Xiangtian Nie, Bo Wang, Tianyu Fan. Analysis of the Transmission of Project Duration and Cost Impacts Based on the GERT Network Technique. Symmetry, 11(3):337, 2019. [doi]

Abstract

Abstract is missing.