Minimizing the weighted number of tardy jobs and maximum tardiness in relocation problem with due date constraints

Bertrand M. T. Lin, T. C. Edwin Cheng. Minimizing the weighted number of tardy jobs and maximum tardiness in relocation problem with due date constraints. European Journal of Operational Research, 116(1):183-193, 1999. [doi]

Abstract

Abstract is missing.