Erratum to "Integrated production-inventory models for imperfect production process under inspection schedules" [Computers and Industrial Engineering 44 (2003) 633-650]

Chen-Sin Lin, Chih-Hua Chen, Dennis E. Kroll. Erratum to "Integrated production-inventory models for imperfect production process under inspection schedules" [Computers and Industrial Engineering 44 (2003) 633-650]. Computers & Industrial Engineering, 48(2):443, 2005. [doi]

Abstract

Abstract is missing.