The following publications are possibly variants of this publication:
- Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup timesShih-Wei Lin, Kuo-Ching Ying, Zne-Jung Lee. cor, 36(4):1110-1121, 2009. [doi]
- Minimizing makespan in a flow-line manufacturing cell with sequence dependent family setup timesHui-Miao Cheng, Kuo-Ching Ying. eswa, 38(12):15517-15522, 2011. [doi]
- Minimizing makespan in mixed no-wait flowshops with sequence-dependent setup timesChen-Yang Cheng, Kuo-Ching Ying, Shu-Fen Li, Ya-Chu Hsieh. candie, 130:338-347, 2019. [doi]