The following publications are possibly variants of this publication:
- Single machine batch scheduling problem with family setup times and release dates to minimize makespanJ. J. Yuan, Zhaohui Liu, C. T. Ng, T. C. Edwin Cheng. scheduling, 9(6):499-513, 2006. [doi]
- A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespanYuan Gao, Jinjiang Yuan, Chi To Ng, T. C. E. Cheng. eor, 273(1):74-81, 2019. [doi]
- Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespanShisheng Li, C. T. Ng, T. C. Edwin Cheng, Jinjiang Yuan. eor, 210(3):482-488, 2011. [doi]
- The bounded single-machine parallel-batching scheduling problem with family jobs and release dates to minimize makespanQ. Q. Nong, C. T. Ng, T. C. Edwin Cheng. orl, 36(1):61-66, 2008. [doi]
- The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespanJ. J. Yuan, Zhaohui Liu, C. T. Ng, T. C. Edwin Cheng. TCS, 320(2-3):199-212, 2004. [doi]
- A best possible deterministic on-line algorithm for minimizing makespan on parallel batch machinesPeihai Liu, Xiwen Lu, Yang Fang. scheduling, 15(1):77-81, 2012. [doi]
- Scheduling jobs with release dates on parallel batch processing machinesL. L. Liu, C. T. Ng, T. C. Edwin Cheng. DAM, 157(8):1825-1830, 2009. [doi]