Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint

Mohamed-Aly Louly, Alexandre Dolgui, Abdulrahman Al-Ahmari. Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint. J. Intelligent Manufacturing, 23(6):2485-2495, 2012. [doi]

Abstract

Abstract is missing.