Bi-criteria group scheduling with sequence-dependent setup time in a flow shop

Dongchen Lu, Rasaratnam Logendran. Bi-criteria group scheduling with sequence-dependent setup time in a flow shop. JORS, 64(4):530-546, 2013. [doi]

Abstract

Abstract is missing.