A note on batch scheduling on a two-machine flowshop with machine-dependent processing times

Gur Mosheiov, Daniel Oron. A note on batch scheduling on a two-machine flowshop with machine-dependent processing times. 4OR, 21(3):457-469, September 2023. [doi]

Abstract

Abstract is missing.