Minimizing total late work on a single machine with generalized due-dates

Gur Mosheiov, Daniel Oron, Dvir Shabtay. Minimizing total late work on a single machine with generalized due-dates. European Journal of Operational Research, 293(3):837-846, 2021. [doi]

Abstract

Abstract is missing.