Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints

K. Neumann, J. Zhan. Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints. J. Intelligent Manufacturing, 6(2):145-154, 1995. [doi]

Abstract

Abstract is missing.