Three scheduling problems with deteriorating jobs to minimize the total completion time

C. T. Ng, T. C. Edwin Cheng, Aleksander Bachman, Adam Janiak. Three scheduling problems with deteriorating jobs to minimize the total completion time. Inf. Process. Lett., 81(6):327-333, 2002. [doi]

Authors

C. T. Ng

This author has not been identified. Look up 'C. T. Ng' in Google

T. C. Edwin Cheng

This author has not been identified. Look up 'T. C. Edwin Cheng' in Google

Aleksander Bachman

This author has not been identified. Look up 'Aleksander Bachman' in Google

Adam Janiak

This author has not been identified. Look up 'Adam Janiak' in Google