Three scheduling problems with deteriorating jobs to minimize the total completion time

C. T. Ng, T. C. Edwin Cheng, Aleksander Bachman, Adam Janiak. Three scheduling problems with deteriorating jobs to minimize the total completion time. Inf. Process. Lett., 81(6):327-333, 2002. [doi]

Abstract

Abstract is missing.