On the trade-offs between scheduling objectives for unpaced mixed-model assembly lines

Frederik Ferid Ostermeier. On the trade-offs between scheduling objectives for unpaced mixed-model assembly lines. Int. J. Prod. Res., 60(3):866-893, 2022. [doi]

Abstract

Abstract is missing.