A Grasp with Path-Relinking for the Workover Rig Scheduling Problem

Alexandre Venturin Faccin Pacheco, Glaydston Mattos Ribeiro, Geraldo R. Mauri. A Grasp with Path-Relinking for the Workover Rig Scheduling Problem. IJNCR, 1(2):1-14, 2010. [doi]

Abstract

Abstract is missing.